Reference: E1284CTRTD-R
The Design, Supply, Delivery, Installation and Commissioning
ESKOM
What this tender requires
Read from this tender's own bid documents. Always confirm against the official documents before submitting.
- Valid B-BBEE certificate or sworn affidavitGet my B-BBEE affidavit · R205
- COIDA letter of good standingGet my COIDA letter · R350
- ISO 14001 certification
- SARS tax clearance (Tax Compliance Status PIN)
- ISO 9001 certification
- Central Supplier Database (CSD) registrationGet CSD registered · R350
- CIDB grading 6EP or higherRegister with the CIDB · R950
- CIDB contractor registrationRegister with the CIDB · R950
- CIPC company registration documentsSort my CIPC filing · R450
- ECSA registration (engineering)
- SACPCMP registration (construction project management)
- 90/10 preference point system applies
- 80/20 preference point system applies
Requirements are extracted automatically and are not a substitute for reading the bid documents. Get a full readiness check.
Key Dates
Published
October 17th, 2025
Closing Date
Friday, 30 January 2026 - 10:00
Description
FOR THE DESIGN, SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF A HYBRID WIND AND SOLAR PV MICROGRID RESEARCH FACILITY AT ESKOM RESEARCH, TESTING AND DEVELOPMENT (RT&D) FOR A PERIOD OF THREE (3) YEARS Category: Construction Type: Request for Bid(Open-Tender) Department: ESKOM
Sectors & Regions
Sectors
Regions
Documents (59)
(39)240-56063805_LV Power and Control cable standard.pdf
PDF • 884.8 KB
(58)240-56364545_Structural Design and Engineering Standard (Rev 4).pdf
PDF • 1511.5 KB
Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx
DOCX • 79.7 KB
Research Facility USL V1 2024 - FINAL.pdf
PDF • 821.9 KB
(12)240-129686484_Power Plant C&I Level of Automation Guideline.pdf
PDF • 994.1 KB
(6)240-114967625_Operating Regulations for High Voltage Systems.pdf
PDF • 1378.8 KB
(0)240-56063805_LV Power and Control cable standard.pdf
PDF • 884.8 KB
(70)240-75880946_Earthing Standard.pdf
PDF • 867.7 KB
240-109253698 CQP Template 2021.docx
DOCX • 105.1 KB
(73)240-76368574_High Security Mesh Fencing Standard.pdf
PDF • 238.2 KB
OHS Evaluation Requirements.docx
DOCX • 85.2 KB
Supplier Declaration of Interest Template (3).docx
DOCX • 138.9 KB
(64)240-62629353_Specification for Panel Labelling Standard.pdf
PDF • 289.0 KB
ANNEX C - Designated Material.pdf
PDF • 16.1 KB
(62)240-61268576_Standard for the Interconnection of Embedded Generation.pdf
PDF • 1363.5 KB
Tender Evaluations Environmental Requirements - BESS & Wind Turbine Poject.pdf
PDF • 116.4 KB
- Typical Activity Schedule March 2025 Rev1.xlsx
XLSX • 293.5 KB
(33)240-54937439_Fire Assessment Standard.pdf
PDF • 1173.1 KB
(34)240-55410927_Cyber security standard for OT.pdf
PDF • 1071.0 KB
(97)240-114967625_Operating Regulations for High Voltage Systems.pdf
PDF • 1378.8 KB
Acknowledgement Form Life-saving Rules.docx
DOCX • 86.7 KB
ANNEX D - Local Content Declaration.pdf
PDF • 25.1 KB
Hydrogen Plant Facility Construction EMP. Signed.docx
DOCX • 1108.5 KB
Annexure B_Eskom Acknowledgement Form.docx
DOCX • 88.5 KB
Tech Returnables Schedule-ver05.2.xlsx
XLSX • 26.5 KB
240-105658000 Supplier Quality Management Specification (3).pdf
PDF • 753.5 KB
20250417_ RT&D Hybrid Solar and Wind Facility- RTD_Cat 3_ Rev 7_signed.pdf
PDF • 190.5 KB
Tender Technical Evaluation Strategy for Hybrind Wind and Solar_ Rev 2.pdf
PDF • 446.7 KB
Rosherville Geotech Report.pdf
PDF • 5711.1 KB
(30)32-438_Information Security Systems Classification Standard.pdf
PDF • 414.5 KB
(13)240-134369472_Substation Earth Grid Design Standard.pdf
PDF • 2188.5 KB
Supplier Declaration of Interest Template (3).docx
DOCX • 138.9 KB
RTD Renewable Hydrogen Facility Rev Specification 23042025 (004)Signed.docx
DOCX • 1770.4 KB
E-tendering Help Manual for supplier - 27 January 2025 (1).docx
DOCX • 1171.8 KB
37-2 agreement form.docx
DOCX • 87.4 KB
C1 1 ECC3_ Hybrid Facility_01102025.pdf
PDF • 1675.7 KB
ANNEX E - Supporting Schedul to Annex C.pdf
PDF • 15.2 KB
20250417_ RT&D Hybrid Solar and Wind Facility_240-68099512 Form A_Cat 3_ Rev 9.docx
DOCX • 91.2 KB
(4)240-109589380_Direct Lightning Stroke Protection of Substations.pdf
PDF • 2224.7 KB
(44)240-56355466_Alarm Management System Guideline.pdf
PDF • 1136.9 KB
(17)240-150642762_Generation Plant Safety Regulations.pdf
PDF • 2288.6 KB
Hybrid Wind and Solar Plant Facility Construction EMP_240 RTD 791.pdf
PDF • 506.2 KB
(49)240-56355789_Flow Measurement Systems Installation Standard - Copy.pdf
PDF • 585.1 KB
Occupational Health and Safety Act Section 37(20 Agreement Form (1).docx
DOCX • 93.5 KB
(48)240-56355754_Field Equipment Installation Standard (Rev 3).pdf
PDF • 688.8 KB
Tender Questions and Answers_ 14 November 2025.docx
DOCX • 593.3 KB
E1284CTRTDR_Letter to Extend Enquiry Closing Date_Hybrid Wind_18 November 2025.pdf
PDF • 270.1 KB
E1284CTRTDR_Invitation to Tender_Hybrid Wind_17 October 2025.pdf
PDF • 1093.3 KB
02102025 Hybrid Wind and Solar PV Microgrids Research Facility Scope Document Final (1).pdf
PDF • 800.7 KB
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
PDF • 626.7 KB
RTD Renewable Hydrogen Facility Rev Specification 23042025 (004)Signed.pdf
PDF • 658.6 KB
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (1).docx
DOCX • 150.8 KB
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
DOCX • 119.2 KB
(53)240-56355888 _Temperature Measurement Systems Installation Standard.pdf
PDF • 318.4 KB
(21)240-150642762_Generation Plant Safety Regulations.pdf
PDF • 2288.6 KB
(59)240-56737448_Fire Detection and Life Safety Design Standard.pdf
PDF • 1322.4 KB
(54)240-56356396_Earthing and Lightning Protection Standard (Rev 2).pdf
PDF • 1461.8 KB
Tender Questions and Answers_06Nov2025 (003).docx
DOCX • 205.4 KB
Copy of 20250929 Standards for Hybrid system components compliance_03.xlsx
XLSX • 20.7 KB
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
Bidding on this tender? We'll prepare it with you
Our team helps you assemble a compliant, competitive submission — documents, pricing, and SBD forms handled with you.
Get bid helpNeed suppliers or materials for this bid?
Get free quotes from verified suppliers and subcontractors so your bid pricing is backed by real figures, not guesses.
Get supplier quotes