Bathroom renovation cost in Polokwane
Full bathroom strip-and-replace: tiling, plumbing fixtures, electrical, painting. Typical 4-6m² space.
Typical cost band
R15 000 – R80 000
Typical timeline: 2–6 weeks
Aggregate range based on operator-curated project shape. Actual quotes will reflect local supplier pricing for your specific scope.
Get all the quotes for this project
One form → 8 quote requests dispatched to verified Polokwane suppliers. Free for buyers.
Start this project →Project line items (8)
One quote request will be dispatched per line below — capped at 12 total.
Services
- plumbing
- flooring
- electrical
- painting
Materials
- tiles flooring — 30 sqm (floor + walls)
- plumbing fittings — 1 set (taps, basin, toilet, shower)
- paint coatings — 10 L (moisture-resistant)
- cement concrete — 20 bag (screed + grouting)